Innovative Security Systems
Documentation
Short walkthroughs, step by step. For installers, dispatchers and site owners.
Mounting the panel on site: location, power, antenna and first start.
6 steps25 min
Laying out fire and intruder detectors across the 24 loops of the panel.
5 steps20 min
How the panel receives new firmware without a site visit.
4 steps10 min
Jumpers J1–J3 set a typical layout for all 24 zones without a computer — meant for initial commissioning.
4 steps8 min
Basic setup of zones, partitions, users and outputs right on the panel, no computer needed.
5 steps15 min
How an owner arms the site from a phone and switches on night mode.
4 steps6 min
How to bind an electronic key to a user through the app or the configurator.
4 steps5 min
Registering a new site in ISS PRO and checking the live channel.