[data-reveal]{opacity:1!important;transform:none!important}

Innovative Security Systems

For installers

InstallingSAQFIRE-24

Mounting the panel on site: location, power, antenna and first start.

6

steps

25

min

SAQFIRE-24

SAQFIRE-24 is mounted once and then runs unattended for years, so the location and the power feed matter more than the speed of the job. This guide walks the whole way: from picking the room and checking GSM coverage to the first test event on the console.

You will need

Screwdriver, cable trunking, wall plugs, multimeter, SIM card with an active data plan

Important

Install with mains power off. Connect the battery last, after checking the polarity of the mains input.

  1. 1

    Choose the location

    A dry heated room that outsiders cannot reach. Check the GSM signal with a phone at the mounting point before fixing the enclosure.

  2. 2

    Fix the enclosure

    The panel mounts on a wall or DIN rail with clearance for the lid and the cable entry below.

  3. 3

    Bring in power

    Mains input runs through a dedicated breaker. Cable type and cross-section follow the site design.

  4. 4

    Fit the SIM and antenna

    Insert the SIM with power off. Keep the antenna away from metal structures and power cables.

  5. 5

    Connect the backup battery

    Connect the battery after checking the mains input. It keeps the site reachable for up to 24 hours.

  6. 6

    First start

    Apply mains power, wait for the panel to register on the network and confirm it reaches the console with a test event.

The result

The panel is mounted, powered from mains and backup, registered on the cellular network and has reached the console with a test event — the site is ready for loop wiring.

Next

Wiring the loops

Open the guide